CNZTL Taile

Technical Guide

Expressing Pressure Requirements in an AHU Enquiry

Published 13 November 2026

An AHU enquiry needs more than an airflow figure and a pressure value. The supplier also needs to know what the pressure value represents and which components it includes. Record that basis beside the duty, so the returned selection can be compared with the design requirement.

Define the boundary before comparing pressure values

State whether the schedule gives the pressure required outside the AHU or another defined pressure quantity. Identify the relevant inlet and outlet reference planes. Ask the supplier to distinguish the external requirement from the resistance of the components included in the unit.

Fan static pressure, fan total pressure and pressure measured across a unit are not interchangeable labels. Request the pressure definition used by the selection and the installation arrangement to which it applies. Do not convert an external requirement into a fan selection by adding values with different definitions.

Keep airflow and pressure on the same schedule

Show the design airflow next to the pressure requirement, using consistent units. Where more than one operating condition is required, list those conditions separately. Identify outside-air requirements and the expected operating range where these affect the arrangement.

An enquiry should distinguish confirmed design inputs from provisional assumptions. If the duct calculation is not available, mark the pressure requirement as provisional and identify who will confirm it before final selection.

Make the component allowances visible

Ask which ducts, fittings, terminal devices, filters, coils, silencers and other accessories are included in the calculation. Their allocation to the unit or the external system depends on the actual layout.

State the filter resistance basis and any design allowance separately. If a margin has already been included, show it so that the supplier can identify it. Additional allowances should be agreed with the project designer rather than added without explanation.

Request the selected operating point

Ask for the fan model, selected speed, pressure basis and input or absorbed power, with those power terms clearly identified. Request the applicable performance curve or selection output and the motor and drive arrangement.

For variable-speed operation, describe the required control function and operating range. Review sound data on a consistent basis: sound power and sound pressure at a stated distance describe different quantities and should not be compared as though they were the same.

Coordinate the installation

Compare the selection arrangement with the proposed connections, transitions and access space. Ask the responsible designer or contractor to review any installation differences that may affect performance. Confirm how airflow and pressure will be checked at commissioning under the agreed scope.

Leave a clear review record

A useful enquiry identifies the airflow, pressure quantity and units, reference planes, included components, filter condition, allowances and control requirement. The returned selection should state any departures from that basis.

Send Taile your equipment schedule and available layout information to discuss the proposed configuration and supply scope.

Send an enquiry · Chat on WhatsApp · Prepare selection inputs

WhatsApp Send drawings Contact Kalyn