Equipment confirmation
Final equipment schedule, configuration, approved dimensions and connection details.

A closer look at air-handling unit assembly, identification, protective packing and truck loading through Taile's own factory photographs.

AHU sections are built to the agreed equipment configuration. The selection review should define the casing, coils, fan, filtration, access side and connections before manufacture.

A unit nameplate and conformity label identify the pictured equipment. Inspection requirements and any witnessed tests should be agreed for the specific order.

Wrapped equipment and timber crates show different packing arrangements. Package type, handling points and transport protection are confirmed for each order and destination.


Loading and dispatch form one part of the supply arrangement. The named delivery point and agreed trade term determine which transport activities and costs are included.

Final equipment schedule, configuration, approved dimensions and connection details.
Unit and package identification, packing list, dimensions and weights for the agreed delivery.
Applicable equipment instructions, warranty terms and the agreed remote or on-site support arrangement.
Taile's scope is equipment manufacturing and supply. Taile can prepare an air-conditioning equipment selection and application proposal from the agreed site conditions. Building works, ducting, water piping and electrical installation are outside our equipment supply. Any equipment-related technical support is defined separately in writing.
Start with the equipment schedule, project location and requested delivery term.